| 
  
 An IQ protocol should be 
 written.    
 The IQ protocol describes how the hardware and system 
 and application software should be installed and should contain:  
 
 ·        
 system description, functional 
 and design specifications as appropriate 
 
 ·        
 manufacturer’s documented 
 recommendations for installation  
 
 ·        
 manufacturer’s instructions for 
 unloading and installation  
 
 ·        
 post-installation procedure, if 
 any  
 
 ·        
 associated equipment (Note: 
 associated equipment should be qualified)  
 
 ·        
 associated conditions, e.g. 
 environmental and ergonomic conditions  
 
 ·        
 associated documentation and 
 deliverables including but not limited to:  
 
 а        
 List of approved deliverables 
 
 а        
 Manuals, operations, 
 administration, technical and maintenance 
 
 а        
 Patch notes and/or release 
 notes 
 
 а        
 Structures list (database, 
 fields, types, sizes, keys, links and referential relationships) 
 
 а        
 SOP List and SOPs (Application, 
 Systems, Environment, Training, IT specific and Corporate Software/Hardware 
 critical SOPs.) 
 
 а        
 Screen shots 
 
 а        
 File list (application, shared, 
 3rd party installation,  
 
 а        
 Module or component list 
 
 а        
 Media list and storage 
 locations 
 
 а        
 Report list 
 
 а        
 Registry changes list 
 
 а        
 Functional Requirements 
 
 а        
 User Requirements 
 
 а        
 Project Plans 
 
 а        
 Flow diagrams and/or schemas 
 
 а        
 User and Functional Matrixes 
 
 а        
 Pre-requisition descriptions 
 and Matrixes 
 
 а        
 Training procedures and 
 employee training records 
 
 а        
 Errors, dialogs and operator 
 interface messages 
 
 а        
 Audits and audit findings 
 
 ·        
 acceptance criteria 
 
 ·        
 responsibilities and roles 
 Qualification scripts may be written to support the 
 requirements of the protocol. 
 Acceptance criteria for the IQ will be documented in 
 the IQ Protocol and the qualification scripts, and will be based on the 
 functional and design specifications along with the installation 
 instructions.  |